Commercial Installation Gamblingay Phase 1

PROJECT DESCRIPTION: Phase 1

Phase 1 – The first area the client wanted doing was the 1st floor design office which has over 30 employees working inside at any one time, along with 2 computers each, and several printers and photocopiers, this space gets very warm in the summer months and unbearable which has a negative effect on employee performance, during the site survey, we looked at all the options available trying to come up with the best solution with the least disruption, we decided on wall-mounted units for the office for a number of reasons, the ceiling was sloped and there was no ceiling void so if we installed ceiling cassette units, they would all be on show and also the installation would be a lot more involved and complex, with more disruption to the working office, choosing wall-mounted units offered a clean look, minimal space used and still able to offer the same capacity. The installation internally only took one full day for a team of engineers to install 2 x 8.0 kw Fujitsu ASYG30LMTA wall units and 1 x 10.0 kw Fujitsu ASYG36LMTA wall unit, these were fitted out of hours on a Saturday whilst the office was empty. The engineers carried out the rest of the installation from the following Monday to Thursday. The client allowed our engineers to use the mobile elevating working platform to gain access onto the roof with the condensing units. We also supplied and installed the electrical supplies for all 3 air conditioning systems, on practical completion we supplied the client with air conditioning commissioning sheets, NICEIC electrical certificates and a planned preventative maintenance plan for the first year, this not only validates the manufacturers warranty giving the customer the satisfaction of knowing that if a part did fail in the coming few years the parts are covered and the client will only be charged for the labour aspect to replace the parts. The client and staff were pleased with the works we carried out and can now be comfortable whilst at work.

PROJECT DATE: April 2018 | PROJECT LOCATION: Gamblingay, Cambridgeshire

 EQUIPMENT SUPPLIED: Fujitsu ASYG30/36LMTA wall-mounted Systems

EQUIPMENT WARRANTY PERIOD: 5 Years