Project Description

Commercial Installation Hertford

PROJECT DESCRIPTION: This project was done for Integra Contracts based in Hoddesdon, the main client was Centurion Electronics, the offices required a full M&E refurbishment which included the installation of air conditioning comfort cooling systems. We installed 6 air conditioning systems in total which consisted of 4 x wall-mounted split systems into the smaller offices (Server room, Workshop, Meeting Room 1, Meeting Room 2), we installed 1 x 14 kw ceiling cassette split system into the larger open plan area on the ground floor (Packaging Area) and we installed 2 x ceiling cassette units on a twin system which done the largest open plan area on the 1st floor, the project took 10 days to complete and the client was pleased with the works carried out. Integra Contracts carried out all of the electrical works needed for this project.

PROJECT DATE: April 2015 | MAIN CONTRACTOR: Integra Contracts (Hoddesdon)

MAIN CLIENT: Centurion Electronic’s (Hertford) | EQUIPMENT INSTALLED: Mitsubishi Heavy Industries split and twin air conditioning systems

EQUIPMENT WARRANTY PERIOD: Warranty supplied by Integra Contracts