Project Description

Commercial Installation Westminster

PROJECT DESCRIPTION: This project was done for Integra Contracts based in Hoddesdon, the main client was Douglas & Gordon letting agents, the offices required a full M&E refurbishment which included the upgrading of the air conditioning comfort cooling systems. The first job was to de-commissioning the Daikin R22 systems and remove the equipment in preparation for the new systems. We installed 5 air conditioning systems in total which consisted of 2 x wall-mounted split systems into the smaller offices, we installed 2 x ceiling cassette split systems into the larger open plan area and we installed 2 x ceiling cassette units on a twin system which done the largest open plan area on the floor, the project took 9 days to complete and the client was pleased with the works carried out. Integra Contracts carried out all of the electrical works needed for this project.

PROJECT DATE: July 2014 | MAIN CONTRACTOR: Integra Contracts (Hoddesdon)

MAIN CLIENT: Douglas & Gordon (London) | EQUIPMENT INSTALLED: Daikin split and twin air conditioning systems

EQUIPMENT WARRANTY PERIOD: Warranty supplied by Integra Contracts